Feb 7 2009  – The first wall was built and erected.

The Walls

There is still a little work required to finish it. The opening is actually for a window, the bottom of
the framing is not complete in this picture. There also needs to be short studs above the window
framing.

I built the 24 foot wall flat and Barbara and I raised it using a couple of wall jacks.

March 2009  – The Front wall (Facing the drive way) is built and raised

April 25 2009  – The remaining exterior walls are raised

And sheathing has started

This is taking longer than expected - May Dec 2009 Framing (including the roof) continues

Beginning to frame the upstairs